top of page

The Green Top House
What did we do?
1 – Up-graded the electrical service to 200 amp
2 – Change the entire plumbing system
3 – Installed central heat and air
4 – Created a new kitchen
5 – Remodeled existing bathroom
6 – Installed replacement window and vinyl siding
7 – Created a laundry area
8 – Replaced front and rear entry door
9 – Removed front entry ramp
10 – Removed front screen porch
01
Front view before – Handicap will be removed, Screen porch will be removed
02
Front view during– Entry ramp and screen porch removed (Not pictured), Remodel of front porch started
27
Bathroom After (View 3) – New mirror, light over mirror and cabinet over commode
01
Front view before – Handicap will be removed, Screen porch will be removed
1/27
bottom of page